• Features

    A Bright Future for 2018

    Bright Economic Skies Ahead “The future is very bright,” said Chris McNally, chair of the Canadian Construction Association (CCA). “Canada’s infrastructure and many federal buildings are aging, and either need replacing or a complete overhaul [...]
  • Features

    Wilson’s Walk

    Architect: Low Hammond Rowe Architects EIFS System Manufacturer: Dryvit Systems Canada EIFS Contractor: H&R Exteriors The Wilson’s Walk project fits into a modern and dynamic residential neighbourhood. The challenge was to create a metal panel [...]
  • Features

    IDP Needs Contractors

    Short time lines, economic payback, and green building all weigh in on the shift in how buildings are constructed in the built environment’s current climate. The integrated design process (IDP) brings order and creativity to [...]